Alberta, Canada

A specialty chemical company built a new blending and warehouse facility in Western Canada.

The project involved:

  • New flammable and non flammable product storage areas
  • Rail Car Offloading facilities
  • Indoor Bulk Storage tanks
  • Truck Loading facilities
  • Blending Facilities

Langtree was responsible for the entire Instrument / Electrical / Controls portion of the project including:

  • Electrical Area Classification,
  • Instrumentation and Electrical equipment specification,
  • Detailed design,
  • Control System configuration,
  • Construction Support, and
  • Commissioning

The major equipment for this project consisted of:

  • Delta-V DCS
  • SICK FLEXI SOFT PLC’s
  • ALLEN BRADLEY VFD’s
  • PROFACE Field Mounted HMIs
  • SCOTT Gas Detectors and Sentinel Controller

Project Details

PROJECT TYPE

Petro-Chemical

Major Equipment
  • Delta-V DCS
  • SICK FLEXI SOFT PLC’s
  • A/B VFD’s
  • PROFACE Field Mounted HMIs
  • SCOTT Gas Detectors and Sentinel Controller
Point Counts

Total I/O count 200, including 12 SIS